  The implementation of working schemes  
 
  1. plan of installation of electrical products;
  2. layout of lightings and switches;
  3. kinds and the sweep of walls;
  4. tile layout;
  5. design of decorative constructions;
  6. floor plan with the type of flooring;
  7. ceiling plan;
  8. explication of finishing materials;
  9. development of water supply and sanitation schemes;
  10. development of air conditioning and ventilation scheme (from 7-13 days).

At this stage, your apartment is worked out in the drawings with the exact location (vertical and horizontal in mm) of sockets, switches, furniture and so on, and also tile layouts, flooring and other details, including explication of finishing materials with the exact cost of the materials. Completion of this phase is a completion of the design project. The price of the project depends upon the size in square meters.